Multiple ChoiceBeginner 45s
Canary vs Blue-Green Deployment
A key difference between canary and blue-green deployment is:
Options
- 1Blue-green deployments never allow rollback once traffic has been switched to the new environment entirely
- 2Canary shifts a small fraction of traffic to the new version; blue-green switches traffic entirely between two environments
- 3Canary deployment requires duplicating the entire production stack and keeping both environments running
- 4They are essentially identical techniques that differ only in naming and in release scheduling order
Think you can answer under pressure?
Get matched and answer live questions in 3-minute 1v1 battles. Elo ranking, badge tiers and bragging rights on the line.